REDUCTION OF STRUCTURAL FAILURES
NO RISING DAMP
NO RADON GAS
NATURAL VENTILATION OF THE FOUNDATIONS
CREATION OF TECHNICAL ROOMS FOR PIPES AND WIRES
NO CRACKS DUE TO THE SETTLING OF THE BUILDING
The need to eliminate the problem of Radon gas is even bigger in those buildings used to accommodate a lot of people, such as hospitals, shopping centres, train stations or airports. Ground Slab system can be used in such large buildings to realize ventilated foundations in a very short casting time.
The so created cavity can be furtherly used for pipes and industrial wire plants.
Moreover, these ventilated foundations eliminate structural failures and cracks due to the settling of the building.